A 62,500 SF light industrial facility with high pile racking. The facility was a pre-engineered metal building with eight (8) loading bays, a small office, and consists of approximately 25,000 sf of climate-controlled space, and 37,500 sf of non-climate-controlled space. This project included a 5-acre site with approximately 3 ac-ft of underground detention.

Details for this Project

year built: 2024

SQFT: 62,500

type: New Construction

components: Pre-engineered metal building, Underground Detention, Heavy Duty Paving, Loading Docks, High-Pile Storage

owner: A-Rocket Moving & Storage

Partners: CBRE, Turner & Townsend, Architechnics/3, Inc, Kirk Paul, Jaymark Engineering Corporation